Construction Past Performance

Department of Navy, Marine Corps. Base Camp Pendleton (MBCP), CA

Scope of Work included for the Design-build and installation 1600 LF of 24 inch diameter waterline, installation of 300 LF of 18 inch diameter waterline. Work included directional horizontal drilling of 60 foot deep 1600 feet long 42 inch diameter tunnel under Vandergrift road. Preparation of environmentally sensitive area at the exit site of the operation. The development of design drawings and specifications, Storm water pollution plans and traffic control plans. Coordination with the Marine Corps Public Works Departments to shut down the base utilities with the least amount of impact to the base residents. $2,333,000 Contract Value.

Stockton Armory, Stockton, CA.

Allied upgraded the fire alarm system at the stockton armory in conjunction with the Army Corps. of Engineers and the California Air National Guard. The project is a component of multi-year and multi-phased project which will enhance the fire suppression and fire alarm system within the armory. $125,000.00 Contract Value

Department of Navy, Marine Corps. Base Camp Pendleton (MBCP), CA

Scope of Work included Hazardous Materials Abatement of Dental Clinic at Marine Corps. Base Camp Pendleton. Project included Electrical, Mechanical, Framing, Finishes, and HVAC Upgrades. $1,275,000 Contract Value.

Department of Navy, Marine Corps. Base Camp Pendleton (MBCP), CA

Scope of Work included the installation of Roofing Systems and Water Proofing Systems at the Medical Clinic at Marine Corps. Base Camp Pendleton. $279,000 Contract Value.

General Services Administration, Federal Bldg. Los Angeles, CA

Allied performed Tenant Improvements inlcluding, HVAC and Elevator Shaft Upgrades for the General Services Administration at its Wilshire Federal Bldg. in Los Angeles, CA. Work was performed during off hours and under critical time constraints. $850,000 Contract Value.

USACE Lake Isabella Emergency Sirens - Lake Isabella, CA.

Allied upgraded and installed various emergency sirens at the Lake Isabella Dam for Kern County in a joint effort with the Army Corps. of Engineers, Sacramento District. Scope of Work Included various Electrical Upgrades in order to facilitate the installation of the Siren Systems which were provided by the County of Kern. $85,000 Contract Value.

Sierra Army Depot, Herlong, CA.

Allied was contracted by the Army Corps. of Engineers Sacramento District to perform various inspection services for the upgrade of its Fire Suppression Doors. $75,000 Contract Value.

Department of Navy, Naval Base Ventura County (NBVC), CA.

Design-Build of SPAWAR Offices at Bldg. 36 at Pt. Mugu. Scope of Work included demolition of existing offices and the completion of various tenant improvements including fire suppression systems, framing, doors and finishes, carpentry, painting, electrical and flooring. Additionally, SOW was increased for the inclusion of the installation of Window Systems to preserve the integrity of the building. $575,000 Contract Value.

Department of Navy, Naval Outlying Landing Field (NOLF), Imperial Beach, CA.

Allied Re- Roofed Bldg. 184 (NOLF) which included the Installation of 20-year Modified Bitumen Roofing System and Energy Efficient Solatube Skylights. $688,840 Contract Value.

Vought Aircraft Industries, Inc., Los Angeles, CA.

Allied was contracted to perform the Demolition and Hazardous Materials Remediation of the Boeing 747 Tool. Work also included demolition of flooring systems and reinstallation of VCT. $458,000 Contract Value

Los Angeles County Development Commission IDIQ Contract, Los Angeles, CA.

Roofing & Abatement. $250,000 Contract Value

Vought Aircraft Industries, Inc., Los Angeles, CA.

Boeing 747 Tool Demolition Abatement, Demolition & Flooring. $458,000 Contract Value